Acts for acceptance plastering walls. SNiP for plastering and maximum tolerances

Floors

This instruction considers the design in accordance with the requirements of the Order of Rostechnadzor No. 470 of 09.11.2017. This order was registered in the Ministry of Justice of the Russian Federation, and after 10 days, the updated requirements for the composition and procedure for conducting executive documentation came into force. From February 26, 2018, the activation of the survey of hidden works on the old forms is illegally.
New form acts of examination of hidden work Developed in accordance with the changes in the city planning code Russian Federationentered into force on 01.07.2017
So, first find out why you need? Act of inspection of hidden work - This is a document that is compiled for fixing the quality control and the compliance of the design documentation of those works that will subsequently will not be visible to the human eye and the presentation of them on checking, without opening and dismantling the overlying structures, will not be possible. For example, when finishing the premises, we first produce plastered, then spatlement, and then staining of the walls. So, before the spit, the act on plastering works is drawn up, and before painting on the shtatlevation of the walls. Thus, we docodely confirm the availability of work performed, as well as their quality. Thanks to such acts, it is easy to provide, and then confirm the construction control of the entire technological chain of construction.
In accordance with the RD-11-02-2006, a list of hidden works that are subject to examination is determined by the project organization. But in fact, not in all projects there is such a list, and if it is there, then in a very trimmed form, which often does not suit the customer or the supervisory authorities. Based on this, it is recommended to draw up acts to all work control over the execution of which cannot be carried out after execution of subsequent work.
The form

The form act of examination of hidden work Installed by the Federal Service for Environmental, Technological and Nuclear Supervision and presented in the RD-11-02-2006 (Appendix No. 3). Changing the shape of the Act and the deviation from it is not allowed. Printing an act is made on one sheet on both sides. If the information specified in the act does not fit on one sheet, additional sheets are printed. But in this case, each Act page is numbered. This is due to the possible submenu of pages, on which there are no signatures.
Now consider the form of an act of examining hidden works and the method of filling it. The first thing that will be required to fill this is the name of the capital construction object. We take information about the title from the project documentation (the name of the object is indicated on the title page or in the stamps of drawings). Important, after the name of the object, make data on its mail or building address.
Next, proceed to the completion of the section, which is dedicated to information about persons who participate in the survey of hidden work. To begin with, we will understand the functions of these individuals.
Developer (technical customer operating organization or regional operator) - A physical or legal person who implements the implementation of the investment project. Simply put - Customer (Project Investor, Owner land plot, structures, buildings, premises, operating organization) or a representative of the Customer on which the leading role in managing the construction process and effective cooperation with the rest of the construction participants is assigned. It is important to know that in accordance with the legislation, from July 01, 2017, only those organizations that are members of the SRO can act as a technical customer.
Construction - As a rule, this person is the general contractor.
Preparing project documentation - A project organization that is engaged in the design of the capital construction facility (reconstruction, repair), and also carries out the construction supervision.
Act of inspection of hidden work 2018, in contrast to the old form, it does not provide for data on the face that carries out the work.
More details with the relationship system of participants in the construction process can be found.
After we found out the role of each participant in the building process, we will have to specify the following data on them: name, OGRN / orGNP, INN, location of the organization, telephone / fax, as well as the name, OGRN, INN self-regulating organization, the member of which is the customer , general contractors or designer.
All this data should be provided by the developer (technical customer). As a last resort, when the developer for some reason refuses you in obtaining this information, you can go to the site of the federal tax service and learn there, most of those necessary to fill out an act of examination of hidden work, information.
Next, we donate the act and assign the number to him. The numbering of acts is better to keep taking into account the names of the project documentation section, which work performed. Suppose the numbering of an act to work on the device internal water supply and sewage will look like this: 1 / VC, where 1 is the sequence number of the act by section, and VK is the name of the project documentation section. Such numbering will further greatly facilitate the search for the right act, and will also avoid confusion in numbering.
At the next stage of registration AOSR (act of examination of hidden works) Fill in information about representatives of individuals who participate in the survey of hidden work. This information includes a position, surname, initials, details of a document on representation (orders and orders), as well as the name, OGRN, INN, and the location of the organization representing a specialist. In addition, data on representative of the developer and representative of the Construction Faculty on Construction Control It is necessary to add information about. Data O. representative of the person carrying out the preparation of project documentation We complement the information about the name, OGRN, the Inn Self-Regulatory Organization, the member of which is a project organization. It is worth noting that as details of the administrative document confirming the authority make information about the number and date of the order (orders) on the appointment of a responsible person. For each representative, the order is yours, and accordingly, the area of \u200b\u200bresponsibility is different. For example, designers issue an author's supervision order. General Contractor and Subcontractor by order prescribed responsible persons for the production of construction mounting work and maintenance of executive documentation. In addition, the General Contractor and the developer (technical customer) are obliged to assign persons responsible for conducting construction controls at the facility. Forms (forms) orders, as well as examples of their fill, you can find here.
To clause 1 act of examination of hidden work The name of the work, which are presented to examination, with an exact indication of the place where they were produced (the axis of the building, the floor, the room (name) of the room, picket, kilometer and other coordinates that allow you to accurately identify the place of work).
To clause 2 We enter the cipher working (project) documentation and numbers of sheets in accordance with which the work was performed. Next, enter the name of the project organization, which has prepared the section of the project documentation.
In point 3 Indicate the name of the materials (products, structures, equipment), which were used in the performance of work to be examined. After each material in brackets, specify the name of the document confirming its quality and safety (certificate of conformity, certificate of compliance of fire safety, sanitary and epidemiological conclusion, certificate of quality, quality passport, technical passport, etc.) and the date of its issuance. The name of the material is fully indicated. For example, if it is a pipe, we indicate the material, diameter, the thickness of the pipe wall. If brick, then we indicate its material (ceramic or silicate) and brand.
To clause 4 We introduce data on executive schemes, laboratory tests, examinations and surveys produced during the construction control.
In point 5 We indicate the actual dates of the work of the works that we place to survey. Dates specified in act of examination of hidden work Must coincide with the dates that are indicated in the general journal of work, the act of acceptance of the work performed by CS-2, a certificate of the cost of work performed and COP costs.
In point 6 Indicate the data (cipher) on the section of the project documentation on which works were carried out, as well as regulatory documents in accordance with which work was performed. And the name of the document is prescribed completely. For example, on the reinforcement works that were performed during the construction of monolithic foundations, enter the joint venture 70.13330.2012 "carrying and enclosing structures".
In point 7 We indicate the subsequent type of work, which, according to the technological chain, we have to do. For example, in the act of examination on plaster work, the subsequent type of work, which is allowed to perform, is the spoiling of the walls or the device of a different finish coating.
The number of instances indicate that which is written in the contract, contract, technical specifications or other document in accordance with which work is performed. If there is no such information in such documents, the number of copies is established by oral negotiations with the customer.
In the Application section, we specify all the documents that we apply to the acts. Such documents are executive schemes (drawings), the conclusions and protocols of laboratory tests, examination and imprisonment of surveys. The list of applications must be numbered.
Please note that in accordance with the 2018 RD-11-02-2006, if one of the items require more than 5 documents, then in such a paragraph, you can specify a reference to the register of such documents, and this registry will be an integral Part of the act.
In the final part act for hidden work We indicate the same faces as on the first page. We write only the surname and initials. No other information about representatives to this part of the act is not required.

The most popular sphere where the acts of work performed (AUR) are most commonly used this is the construction industry. This is not necessarily forms of COP-2 and COP-3, often the customer and the performer need acts on a simplified form, which are not regulated by the legislation of the Russian Federation.

We present you the greatest selection of acts of work performed in construction. If you did not find the act you need, then leave a comment, and we will send you the necessary form soon.

With plumbing services face almost everything as owners of new buildings and secondary housing. This type of services includes: installation / disassembly of plumbing, installation of warm sex, adjustment and connection of finished equipment (water treatment system, water heater, high pressure station), connectivity washing machine And much more - all this is included in the list of plumbing services.

AUR - is a confirmation and reason for payment you can download free on the link below.

Act of work performed on design sample

The design does not always deal with major institutions such as "Southgiprogaz". For example, design fire alarm Or ventilation systems for a small store performs a small firm with appropriate tolerances and licenses.

Sample work performed download the link below. This act is made in three-sided form, because In case of error detected at the installation stage, one can determine which of the designers allowed it.

Act of the test work performed sample

According to the "gross" statistics of the attack of work performed on state-owned construction sites from 30 to 40%. Therefore, together with AVR, the act of the control overspend of the work performed, which can be downloaded for free from our site by reference below.

Act of completed work on the installation of windows / windows PVC sample

A rather simple act, but it is necessary first of all by the installers of windows. Therefore, it is made of two parts - the second tear-off and remains among the representatives of the company who performed work. In this document, there is a graph that the PVC windows are mounted, and there are no complaints with the performer.

Act of completed furniture assembly sample

Standard furniture assembly services: installation of kitchen, wardrobe, wardrobe systems and others. The act of completed furniture assembly works is a confirmation of payment for these services. It is necessary to indicate the furniture in the desired column of the Act presented below by reference.

Act of completed electrical work sample

The problem of our legislation is that the work of the electrician during the repair of the apartment can perform any Vasya Pupkin, while not having due qualifications and education.

And no matter how sad it was, in modern economic realities, the malaries and plasters are performed. Only the consequences of such work can be deplorable and lucky if it is just a smoke or a fire will be localized at an early stage.

But this is all the lyrics, we are interested in the act of completed electrical work, you can download it on the link below.

Act of the completed electrician

The preceding document is similar, but the Customer and the Contractor are not legal entities. Accordingly, there are no details, VAT and seals and other standard fields for CS-2-based acts.

Act of work done on the installation of stretch ceilings

Stretch ceilings over the past 10 years have ceased to be know-how, becoming the "golden" standard. Thanks to the practicality and long term, the company gives it up to 15 years warranty.

But then read carefully the contract, as it is often the interpretation there: they say on the web 25 years, but for the work performed 1 year.

In any case, you will need an ABR on the installation stretch ceilingswhich you download on the link below.

Act of completed installation work sample

Under construction in construction, you can perceive anything, from installing primary converters to metal structures. Therefore, in the relevant document, we indicate what installation, who performed and other standard fields. You need an ABR you can download the link below.

Act of completed work on finishing work sample

Finishing work implies a wide field of activity: plaster, shtclowing, installation of MDF panels and much more. Therefore, when the apartment or office is repaired, constitute intermediate acts of completion work performed. For example, work on the plaster "N" - signed AVR - get a cash remuneration.

Finishing work

Composition of operations and controls

Stageswork Controlledoperations Control(method, volume) Documentation
Preparatory Check:

Act of acceptance of previously performed works;

The presence of a passport for a solution received and its quality;

Cleaning of the surface from dirt, dust, soot, fat and bitumen spots, spoken salts;

Performing the tossing of vertical and horizontal surfaces;

Wall moisture and air temperature (8 winter time).

Visual, measuring

Measuring of at least 3 measurements by 10 m 2 surfaces

Laboratory control

Act of acceptance of previously performed works, passport, general work log
The process of plastering Control:

Vertical, horizontal of plastered surfaces;

Quality of the surface of plaster

Visual

Visual

General Journal of Work
Acceptance of the base Check:

Stucco clutch strength with base;

The quality of the plastered surface.

Visual

Measuring at least 5 measurements by the control two-meter rail at 50-70 m2 of the surface or on a separate section of a smaller area in places revealed by a solid visual inspection

Act of acceptance of work performed
Instrumental Tool: Construction plumbing, metal line, Reika- rule, leases

Acceptance controls are carried out: employees of quality service, master (foreman), representatives of the customer technician.

Operational control is carried out: Master (foreman), laboratory assistant (engineer)-in the process of work.

Technical requirements

SNiP 3.04.01-87 Table. 9, 10.

Allocated deviations:

Surfaces from vertical on 1 m length - 2 mm;

For the entire height of the room - no more than 10 mm;

Irregularities of the surfaces of a smooth outline (at 4 m 2) - no more than 2 depth (height) to 3 mm;

Window I. door slopes, pilaster, pillars, luzg, etc. from vertical and horizontal (mm per 1 m) - 2 mm;

Radius of curvilinear surfaces tested by lecturers from the design value (for the entire element) - 7 mm;

Surfaces from horizontal by 1 m length - 2 mm;

The widths of the proportion from the project - 3 mm;

The straight line from the straight line is between the corners - 3 mm.

The moisture content of brick and stone surfaces during plastering is not more than 8%.

The thickness of each layer during the device of multilayer plasters without polymer additives, mm:

Spray on stone, brick, concrete surfaces - up to 5;

Spray on wooden surfaces, including the thickness of the drady - to 9;

Soil out cement solutions - up to 5;

Soil from lime, lime-gypsum solutions - 7;

The stucco coating layer-to 2;

Cutting layer of decorative decorations - up to 7.

The tensile strength of plaster solutions, MPa, not less:

For internal work - 0,1;

For external work - 0.4.

Not allowed:

Cutting plaster, cracks, sinks, suits, traces of a grouting tool.

Requirements for the quality of the materials used

GOST 28013-98. Construction solutions. General specifications. SNiP 3.04.01-87. Insulating and finishing coatings (Table 8).

Plaster solutions set for the construction site must comply with the following technical requirements:

Pass through the mesh with cell size:

Solutions for spray and soil - 3 mm;

Solutions for the corrupt layer and single-layer coatings - 1.5 mm;

Mobility within - 5 + 12 cm;

We are wearing sustaining no more than 15%;

Water-holding ability - at least 90%;

Strength - by the project;

The plastering solution should be prepared on the sand with the size module from 1 to 2; Do not contain grains of over 2.5 mm in solutions for spray and soil and over 1.25 mm for finishing layers.

The plastering solution must be accompanied by a document on the quality document, in which: date and time (hours, min.) Preparation of the mixture, solution brand, type of binder, amount of mixture, mixture mobility, standard designation.

The plaster mortar mixture was delivered to the construction site should be unloaded into an overwhelming mixer or to other tanks under the condition that the specified properties of the mortar mixture are preserved.

Instructions for the production of work

SNiP 3.04.01-87 PP. 3.1, 3.3, 3.7-3.11, 3.15, 3.37, 3.18

Plastering must be performed at a positive temperature. ambient and finished surfaces not lower than 10 "C and humidity of air no more than 60%. This room temperature should be maintained around the clock at least 2 days. before the start and 12 days. After completing the work.

Finishing works must be carried out in accordance with the project manufacturing project (PPR) on the construction of buildings and structures. Before the start of finishing work, the following works must be made:

Protection of the premises of atmospheric precipitation is performed;

Waterproofing, thermal insulation and leveling balls of overlapping are arranged;

Seams between blocks and panels are sealed;

The places of conjugates of window, door and balcony blocks are taken and insulated;

Glazed light openings;

Mounted products are mounted, test systems for heat-generation and heating systems.

Plastering and facing (on the project) of surfaces in places of installation of mortgage products of sanitary systems must be performed before the start of their installation.

The execution of plastering coatings on the bases having rust, zip, fatty and bitumen stains, is not allowed. Dusting surfaces should be made before applying each layer of plaster formulations.

The strength of the bases should be no less than the strength of the finishing coating and correspond to the project. Speakers architectural details, places of conjugation with wooden stone, brick and concrete structures should be shuffled by attached to the surface of the base metal grid or wire; Wooden surfaces - on shields from drash.

Internal surfaces of stone and brick wallsErected by freezing method should be placed after thawing the masonry from the inside of at least half the wall thickness.

When plausing walls of bricks at ambient temperature, 23 ° C and above the surface before applying the solution, it is necessary to moisten.

When applying single-layer coatings, their surface should be spacing immediately after applying the solution, in the case of the use of molding machines - after grasping it. When a multi-layer plaster coating device, each layer must be applied after setting the previous one (the corner layer after setting the solution). Smoking the soil should be performed before the decoration of the solution.

Many before starting repair thinks whether they need to hold plaster works, it is connected with one fact - ignorance of implementation technologies repair work And the consequences of their no compliance. - This is the process of aligning any surfaces vertically and horizontally using special dry mixtures (gypsum, cement-lime plaster). The main task of applying plaster is to get the right geometry of the premises: an angles of 90 degrees, a width alignment door openings and slopes, performing the parallelism of the walls, obtaining a single and flat plane.

Stuccoing for the quality of execution is divided into three categories: simple, improved, high quality.

Document Regulatory quality and technology of these works -

All these requirements are as for manual application of plaster and machine.

Plastering
Parameters and properties of plasterSimpleImprovedHigh quality
Deviations from vertical on 1m, no more3mm2mm.1mm.
Limit deviation from vertical on
All the height of the room
15mm.10mm.5mm.
The number of irregularities by 4m2, not more3 2 2
The depth of irregularities is not more5mm.3mm2mm.
Deviation from horizontal to 1m, no more3mm2mm.1mm.
The humidity of the base is not more8% 8% 8%

Plastering layer thickness (plaster)

Under the technology of plastering work, it costs to pay special attention to the thickness of plaster, both minimal and maximum allowed!

These values \u200b\u200bdepend on the plastering mixture and each they are different. For example, for gypsum plaster Machine applying KNAUF MP-75, the thickness of the plastering layer must be within: from 8 mm and up to 50 mm (for one). If you need to apply plaster with a thickness of more than 50 mm, then this should be done 2 times with drying and repeated priming of the first layer. See this information in the descriptions of plastering mixtures and better on the sites of manufacturers!

Permissible thickness of the plastering layer

Based on these parameters and curvatures of your walls, the corresponding mixture should be selected.

This is very important parameterFrom compliance with the quality and durability of plaster! If this requirement does not comply with the appearance of cracks on the surface and even detachment from the base.

Main excerpts from SNiP for plastering

3.15. When plausing walls of bricks at an ambient temperature of 23 ° C and above the surface before applying the solution, it is necessary to moisturize.

3.16. Improved and high-quality plaster should be performed by lighthouses, the thickness of which should be equal to the thickness of the plastering without the corrupt layer.

3.17. When applying single-layer coatings, their surface should be spacing immediately after applying the solution, in the case of the use of molding machines - after grasping it.

3.18. When a multi-layer plaster coating device, each layer must be applied after setting the previous one (the corner layer after setting the solution). Smoking the soil should be performed before the setting of solvent.

3.19. Sheets of plaster plaster must be glued to the surface of brick walls with comprehensive design, located in the form of grades, the size of 80x80 mm on the area at least 10% along the ceiling, floor, the angles of the vertical plane after 120-150 mm, in the intervals between them at a distance not more than 400 mm, along the vertical edges - a solid strip. Sheets to wooden bases should be mounted with nails with wide hats.

3.20. The installation of molding products from plaster should be carried out after setting and drying the base from plaster solutions. Architectural parts on the facade must be fixed behind the fittings laid in the design of the walls, pre-protected from corrosion.

We also offer to read the mesh, mixture consumption, beacon removal, special primers, plaster for beacons, etc.).

These work on various building materials are used: monolith, brick, foam concrete using special primers for each type of material. Before applying plastering on metal and wooden surfaces, it is necessary to make special preparations (to fill the metallized plaster grid, to cubs the surface of a special primer), we do not recommend performing plastering on such surfaces, it is better to resort to the use of a dry alignment method - installation of sheets of HCL. On the sheets themselves, it is impossible to place the sheets of drywall, as under the action of moisture, the sheets of GLCs can deform if you are crookedly assembled by partitions from drywall, it is better to remake them than to align the stucco.

There is no regulations on the installation of a plaster mesh, therefore this process is a purely advisory nature.

We advise you to apply a plaster grid with a thickness of the plastering layer from 50 mm, as well as on the walls of foam concrete, since there is a great possibility of cracking.

The act for the acceptance of the completed work is drawn up after the contractor fulfills its obligations. The act is not independent documents, but serves as an attachment to work under a contract. It is part of the procedure for receiving the results of work and serves as a basis for final settlements on the contractual contract between the customer and the Contractor.

Files

Rules for compiling an act of acceptance of work performed

This document does not have a standard approved on the legislative level, a single sample, so it may be issued in a free form or on the template developed at the enterprise. The act is printed on the usual A4 sheet of the format in two copies - one for each side. After all the work is completed and cooperation under the object is completed, the ACT is transferred to the accounting department of the Customer's enterprise to compile funds based on its financial statements, including accounting for incurred costs and a decrease in income tax.

When executing an Act, the rules and regulations of the office work developed for this kind of documents should be adhered to. In particular, the typical act must necessarily contain

  • information about both sides of the contract
  • a brief information about the contract itself, which was carried out by work,
  • name of works,
  • date of work,
  • quality and cost of work performed.

The act should be signed by the heads of both organizations and stamped by seals (since 2016, the presence of seals and stamps legal entities is not the requirement of the law, so the lack of imprint is not a strict necessity)

In the case of a large amount or special complexity of work produced, to assess their quality, as well as the execution of the act, a specially created commission, which includes representatives of the contracting organization and the company - the Customer.

With the urgent need to be brought to the third party in the form of experts or representatives of controlling government instances. Their work must be fixed in the act, each expert must also put its signature under the document.

What is needed by this act

Act of acceptance of work is a kind of guarantee from the occurrence of litigation and disagreements. If such a proceedings still arises, the act becomes a evidentiary document. The lack of an act of the Court may regard how neglecting the legislative procedure for the commissioning of work, which in turn may entail the imposition of penalties on the part of controlling structures.

From the list of completed work make up a table. The document records and the fact that the work is performed properly and the customer has no complaints with the Contractor.

In cases where the customer remained unhappy with the quality of work, it should also be reflected in the act with a detailed listing of identified deficiencies, as well as an indication of the deadlines for eliminating them.

Instructions for registration of an act of acceptance of work performed

After signing the act of acceptance of the work performed, all claims can only be considered in court.