The permanent element used when refurbishing the local area is paving slabs. It is perfect for accessing avenue, garden tracks, yard, recreation areas. Many do not know how to properly put the paving slabs with their own hands, but if you know the technology, then even novice builders will seem easy.

Methods of laying paving slabs

Such a coating used in the landscaping of the territory as paving slabs is very popular and often used by many owners of cottages and cottages and country houses. The material is relatively inexpensive, and the installation process is easy. The tile is distinguished by high quality characteristics - stability and exposure of loads with long-term operation, so it can be found not only on the streets / private houses, but also in playgrounds, cemeteries, other places.

Many wonder: what to put the pavement tile? Construction specialists allocate three types of styling:

  • put on a concrete pillow;
  • put on the sand;
  • put on the ground (land).

If it is not possible to independently put a blocking, you can always use the help of professionals, however such work will be expensive. Prices for square meter All masters are different, but the average price is approximately:

  • turnkey on concrete - from 2000 rubles;
  • turnkey on the sand / crushed stone - from 1,500 rubles;
  • put on the finished base - from 500 rubles.

Given the high cost of work, it is best to learn to this case yourself, because the installation process is not so complicated. On the Internet / construction logs, you can find a lot of useful information (photos, videos, step-by-step instructions, schemes) for the layout of the tile. The main requirements are extract, perfection, attentiveness. Having given these qualities, you can easily make a beautiful track in your dacha or to impose the floor for the arbor.

The technique of paving tile on concrete has both positive and negative nuances. Basically, this type of paving is used for accessing alleys before the garage, as it is able to withstand heavy loads. Tile thickness also plays a big role. The concrete screed is poured in the case when the crossbar of the stone bars is more than six centimeters. The pros will be attributed to:

  • greater coating strength, in contrast to sandy cement pillows;
  • smooth laying of blocks due to the stiffness of the concrete base;
  • lack of shrinkage and failures at the time of solidification;
  • the possibility of landing on special glue.

Before laying out the paving slabs onto a concrete pillow, you need to think about the important negative nuance of the drainage. When mounting a pavement on a sandy-cement base, moisture goes through a hygroscopic layer into a deep ground. If the use of concrete, without taking care of the drainage, the fluid will have nowhere to go, and it will start pushing the tile upstream. So that this does not happen, it will be necessary to take care of the additional construction of landfills or moisture applicants, installation of geotextiles.

Laying paving slabs on sand

The most popular way of mounting a paving slave, which is often used on dachas and in country houses for making tracks, yard, floor in arbors - is laying on a sandy pillow. Thinking about how to lay pavement tiles, many people are solved on this economical, fast and simple option. When creating a sand-cement substrate, a number of specific rules should be followed:

  1. Create a mixture of dry sand (necessarily by making an explorer before this) and cement powder, calculating the components of six to one (best with the help of concrete mixer).
  2. Add water and stir well.
  3. Before laying out the tile, be sure to add to the gravel solution, pieces of clinker brick or construction trash to seal the future substrate.

On such a mixture, you can lay a paving from a variety of materials: solid rocks (Granite, basalt), less dense stone (slate, limestone), brick or ceramics. The choice depends on the desire of the buyer, the price and intensity of use. For accessing avenue, it is best to choose a more durable and wide material that can every day to withstand the weight of the car and do not spoil over time. Tracks, playgrounds and gazebos can be poisoned by any of the existing bars, the main thing is to suit the price and appearance.

On earthlings

Another simple laying method is directly on the earth ground. In order to make the path from the cottage or country houseIt is necessary to use a large tile imitating a natural stone. The price of these decoration elements is small, but they look very attractive. Power is done in pre-prepared pits, and then there is a tamper with the help of a special tool - a hammer with rubber tips (cynica). To know how to put the pavement tile on the ground, you do not need to be a master or professional - this method is very easy and fast in use.

How to lay paving slabs with your own hands

So, how to put the paving slabs properly with your own hands? To begin with, prepare tools:

  • master OK;
  • kiyanka (rubber);
  • tamping (or manual, or purchased device);
  • wooden pegs;
  • cord-dealer;
  • level;
  • tube of any diameter;
  • watering can;
  • rake;
  • broom;
  • cement, sand and stones solution.

How to properly put sidewalks:

  1. Prepare a plot for work: Clean the garbage from the garbage, dig the ground on the necessary territory, spread the tags (pegs) at the corners.
  2. Tension the cord-order to calculate the volume of upcoming work and stick to its accuracy.
  3. Plant water drainage, drainage system.
  4. Install the curbs in the desired order around the perimeter on the liquid solution, thereby determining the height of the laying.
  5. Fill the workspace with a sandy-cement mixture and evenly distribute it with robbles (you can spend a thin pipe throughout the portion).
  6. Tightly confuse sand.
  7. Start raking the first row of tiles from yourself, having it strictly over the cord.
  8. Place the "bricks" tightly, in order to avoid increasing seams.
  9. Use special crosses by inserting them between the plates to set the same intervals with accuracy.
  10. In the process of laying, follow the level of sand under the paving - the extra need to remove the missing - add.
  11. Align the blocking with the help of the level and the queen.
  12. At the end of the work, fall asleep the seams with a sandy cement mixture and sprinkle with water.

Video: how to put the pavement tile

If you do not know how to put the pavement tile on my own, so that it looks beautiful and remained in this form for many years, useful video tutorials with the advice of professionals will help you with this. How is a high-quality pavement for sale? What are the necessary tools for masonry? What sequence takes place the stove power process? These and other questions you can find answers in the videos below.

Laying paving slats with their own hands

How to put sidewalk on the cottage

Maxim Gorky correctly noticed that the wise strength of the builder is hidden in every person, and it is only necessary to give her will to develop and bloom. A great opportunity to do is to build a house. And when he is ready, it's time to think about the device of garden and access roads. Since asphalting or concreting has long been outlined, remaining in the past, we advise you to pay attention to the paving slabs. Now there is a huge choice, and paths and platforms paved by paving slabs look pretty aesthetic and serve for a long time.
Benefits of paving slabs as a building material

Laying paving slabs, video lesson

There are several main advantages of paving slabs in front of ordinary asphalt, concrete and other materials for paving tracks.

1. Universality. Paving tile can be laid in areas of any destination: garden tracks, playgrounds, sidewalks, alleys, public transport stops. And the variety of forms and designs of this material allows designers and designers to embody any ideas and ideas of paving platforms.
2. Reliability. Paving tile It has high strength, it can adequately withstand heavy loads up to 15 years. The latest technology In production building materials They allowed to increase the frost resistance of paving slabs up to 150 cycles and more.
3. Aesthetic appearance. There are many different species paving slabs on texture, form, color gamma, Making a method, which allows you to create an original landscape ensemble on its site. And after the rain, the water is not stored on it, but seeps through the intercutric seams with sand.
4. Low cost. Paving slabs are available to middle-income people, it is easy to use, and you can lay it with your own hands. In the case when it is damaged small plotIt can be easily repaired, replacing spoiled tiles with new ones. Agree, the asphalt track is so simple not to restore, and the traces of repair will always be visible.
5. Ecology. The tile for sidewalks is made without adding harmful impurities, so when heated (in hot weather) is not softened, and the carcroins do not stand out. The trees and shrubs growing near the sidewalks do not suffer from the lack of water and gas exchange.
We hope that the above benefits of paving slabs convinced that exactly from this material will be tracks near your home. To lay this material of special skills not necessarily, so everything can be done with your own hands. This is, first, savings, and secondly, invaluable life experience. And let them only try to disagree that you are on all the hands of the master!

Laying of paving slabs with their own hands: a set of tools and additional materials.


In order to qualitatively choose the paths with sidewalk tiles, you should cook a set of simple tools that are in the workshop for each owner:
Rubber hammer
Master OK
level
pegs
Broom or broom
Hose for watering
Cord for marking
sieve
Bulgarian
Sand Alignment Device
Vibratinglitis (you can use logs with handles)
Of the additional materials you will need sand,, border.
Paving slab You can lay a few foundations: on sand, concrete or crushed stone. The most popular method that is suitable for garden tracks, sidewalks - laying on a sandy basis.

Phased instructions for laying paving slabs with their own hands


1. Work begins with the preparation of the site. To do this, make the marking of the track contours using pegs and cord. Do not forget about the embossed features of the paving site. With the help of the level, you need to determine all the irregularities, take care of the right slope so that rainwater does not cause.
2. Prepare a pillow for paving slabs. To do this, remove 15 cm top layer of soil, remove the roots of plants, weeds. We are conclusion and tamper with the help of vibratinglitis beds, we fall asleep with sand 5-8 cm, but rake, pour water from the hose with a sprayer, leave dry, align the pillow.
3. Install the border. Since the pavement tile laid on the sand, without a border can not do. It will allow you to keep the shape, not sprawling the pillow when laying, prevent the deformation of the sidewalk during operation. The border make the same height as the track itself or slightly above it. To do this, dig a small trench around the perimeter, we fall asleep sand, we are tamping it, put the border, strengthening it cement mortar at both sides.
4. We put the tile. To do this, use a sandy-cement mixture in a ratio of 8 to 1. We remind you that, depending on the shape and type of tile, it can be laid in different ways. It is necessary to think over and sketch on paper in advance or pre-lay a pattern on the sand. Each tile is pressed in the sand, we will be tamped with a rubber hammer. If after a bit flies or staggers, it must be removed, shove the mixtures and secure in a new way.
5. Fix the result. Laying paving slabs finished, you need to pour over the entire surface sand-cement mixture And dwarked by filling out intercutric seams. For the best precipitation, paint the track or water platform with a spray hose. Sand condenses, you will have to repeat the procedure again. Let's stand up to the site until the sand drying a couple of days and can safely walk along it.
It is possible that during operation paving track There will be flaws, defects. They are easily eliminated by plugging the missing sandy cement mixture. And the last advice: for cleaning sites and paths with paving slabs Do not use a metal tool, for example, when removing ice or snow - it can damage the coating.
Competently and qualitatively laid paving slabs will serve its owners for a very long time and will always please their aesthetic appearance.

No one will argue with the fact that it looks much better and more attractive than the coating of asphalt.

In addition, such a coating is practical. If before starting work, how to explore the question, how, it will be possible to avoid many errors. As a result, it turns out a wonderful coating for cottage plotwhich will be perfectly harmonized with facades and site objects. On the surface of the tile coating, when proper layingAfter the rain will never accumulate water. When heated, it will not melt and extract harmful substances. She will last for many years. But if the owner of the country area wants after some time to change the old tile on a new one, it will be very easy to do. It is easily dismantled. Yes, and put the paving slabs with their own hands will not require some special technique or skills.

The tile is a beautiful coating for the country area, which will be perfectly harmonized with the facades and the objects of the site.

At the unstable soil, under the specialists recommend putting the substrate from the crushed stone. If the soil is mostly sandy, then the laying of the crushed stone is not needed. If the track will be placed on the same level with other surfaces, it is necessary to make an additional recess by the place where the track will be held (about 15 cm). If you should strive to make its surface as smooth and correct. The smaller the surface will be, the longer the track will serve and perform its functions. If in the process of laying it will be necessary to remove or plug the soil, it needs to be done. On an uneven, unprepared surface, exactly put the tile will not work. Following the planned plan, in places where the tile will clash, you need to drive a wooden pegs and pull the rope along them. If the track is in several levels, each platform for the level is aligned separately.

If the track is in several levels, each platform for the level is aligned separately.

First of all, side borders are installed. They can be made not much higher than the path or one height with it. The main task of borders is to prevent the spreadsheet of paving slabs and keep it in place. To install them, you need to dig a trench, fill it with cement mortar and level blocks by level. Fixing them, sand or soil is being sweeping. Some use invisible backups instead of ordinary borders. And after they begin to align and tarnish the surface of the tile laying itself.

Back to the category

Preparation of the surface with your own hands

Initially, it is necessary to ravage naturally crushed soil. The sand layer is full, about 5 cm thick. It is wetted with water and after some time (until the sand is still wet), observing the same level over the entire surface. On top of the layer of sand, the layer of rubbank is poured. It is compressed and poured with a special fastening solution. If it is planned that the track will not only be pedestrian, but cars will also ride, then a reinforced grid is placed on top of the crushed stone layer. If there are also cargo transportation on the way, experts advise to increase the thickness of the working layer at least one and a half times or enhance the cement substrate. In order to ensure trouble-free rainwater flow, it is necessary to level the surface at a low angle (maximum 5 degrees).

Strokes on the ground can be done both longitudinal and transverse. During operation, you must not forget to use the level all the time. The last layer (sand-cement) is mixed from the proportion of 3: 1 and poured a thickness of 3 cm. This mixture is properly spread to the track portion and spoil with robbles. The better the reasonably the foundation is done, the longer the track will be.

Many wishing to independently lay out the paving slabs on a residential area, you need to get acquainted with step-by-step instructions of the technological process. Paving tracks and part of the territory, creates aesthetic type of landscape, makes it possible to move in any direction, regardless of weather conditions.

Introduction

On the duration of the operation of paved areas, affects the quality of the material used, and the technology of laying paving slabs in the courtyard of a private house or the country area. Work is interesting to fulfill yourself, getting satisfaction from the result of labor. Not every home owner will entrust the styling of the acquired source material invited specialists, without making sure their professionally. Observing the phased sequence of the process, and the advice of a specialist of this article, the end result will be achieved.

Selection of material

Varies in thickness, color, form and wear resistance. In the construction market, it is proposed for paving the product made by different technological tasks, this is a method of casting or pressing.

  • Vibrating. It loses its brightness faster and is amenable to erasing. This material is economically beneficial for the price. It is placed in areas of the path with a small crossway.
  • Vibropressed. The pressing method makes the structure of a dense, non-wear, which guarantees quality and endurance to abrasion. It is used for powering driveways to the car park.

Use the following tile thickness in millimeters:

  • Pedestrian walkways, sidewalks and scene from 25 to 40.
  • Driving path to a car parking from 40 to 60.

The large size of the material is more difficult to make laying. The heavy slab has to raise often, leveling levels. Working with a small and medium product size, it is easier to create an ornament.








Project

The new land area will require pre-breaking tracks. Making markup, take into account the standing objects requiring approach. The shortest link lines are not always straight. Learn the paths formed by a natural way, with their absence, launch new, leaving for time without coating. Making sure the correctness of the proposed movement scheme on the ground, begin work on soil cleaning.

general information

Characteristic of soil

The structure of the Earth affects the choice of material for the base under the tile. The soil is divided into the following types:

  • Mobile. It requires an additional concrete screed, which provides the stiffness of the design of the sidewalk.
  • Dense. Limited to bulk sand.

Reserve a place for pipes or cable

They advise you to complete all work on laying communications before paving the tracks. It is difficult after dismantling to restore their level and drawing. Preliminary laying option is allowed plastic pipe A diameter of 50 millimeters, for the purpose of subsequent use.

Protection against germination of vegetation

Geotextiles are laid on the ground, for subsequent layer-by-layer embankment or concreting. It will fight from the destruction of the seams of the combination of the weed.

Conditions for draining rain, melt or irrigation water are created.

The sand base absorbs excess moisture through the joints of the joint, which cannot be said about the concrete pillow. In any of the selected options, the track is made on the elevation above the ground level, under the slope in one direction, or oval. The magnitude of the skate is 1 centimeter or 5 degrees per 1 meter length. Water absorbed concrete slowly. The lack of runoff will lead to its stagnation, and will cause the layer extinguishing. On the side of the border, put the emblek - Aryk, for water drain, and remove it into a specially designated place.

Note

Laying tile products is possible under the following conditions:

  • A bulk pillow after falling precipitation is sucked naturally. Surplus moisture is poorly reflected on the quality level alignment.
  • The sand is used in its pure form without clay impurities.
  • The planned width of the track is adjusted for the size of the paving slabs. Before the formation of mounds on the ground, create a model of an ornament according to the designed design project.
  • Geometric shape, laid out the pattern. When paving, they create a chessboard, rhombus, fuel, coils, wedge, bees, bees or asleep butterflies.
  • Tile having 3D. Effect, or the illusion volume perception of the pattern laid out by a flat material.
  • Artistic disorder. It is created using different colors, shapes and sizes.
















Tool

  • Rope or Capron thread.
  • Wooden stakes.
  • The hammer with the rubber knob (cynicha).
  • Level.
  • Tamble.
  • Master OK.
  • Broom.
  • Bulgarian for cutting material or alignment of concrete base.
  • Podpoles for a comfortable foot stop during work.

Preparation

Using the location project of the tile, and the calculated width adjusted for the size of the material makes marking on the ground. Plugs are driven along the contour. In direct areas, their number is limited. For rounded and oval, molds closed areas of territories, more stamps are required. Stretch the thread using the level.

Before filling the mound pillow, clean the separated area from weed, plant roots, stones, and remove the top layer of the turf. Loose soil is watered, and seal the tamper.

It is allowed to use geotextiles that protects the germination of weed through the joints of the compound.

Laying limiters

The border is installed in the prepared trench along the contour of the intended pavement, is fixed with supports, and is poured with concrete solution. After full frosted, extra details are removed, and the resulting monolithic frame of sand or ground is sprinkled. The curb protects the design from the deformation of the contours, fixing the initially specified parameters, and makes the drawing finished.

The material for the contour limiter serves a tile, stone or plastic, installed at the track level, or slightly higher, with a reserve for shrinkage.

On the side of the slope (skate), stacked the jolub for water. It is effective in the presence of a natural tilt track, ensuring stock.

Formation of the substrate

Depending on the wishes and type of soil, it is made different in the composition of the material. It is proposed to consider each other option.

Sandy

Created artificial path in the ground fill. The first layer is sand, 10 cm high, further, drainage bulk material. We use gravel or crushed stone, raise the level to 20 for sidewalks, and 40 centimeters, for access roads and parking lots. The crushed stone is pure sand, a layer of 200 millimeters or higher, depending on the thickness of the paving workpiece, filling the existing emptiness in the mass of crushed stone, and creating the basis of tiles.

Ready for laying the base is aligned, and spray water from above. For the upper layer, fine sand is used, providing good fixation. After easy moisturizing, they give the surface to dry, then, align, retain the angle of inclination.

Sand-cement

Both components are combined into a single composition. Dry mortar in the following parts:

  • Sand - 3.
  • Cement - 1.

The mixture is made to the intermediate layer on gravel, is not moisturized before placing paving slabs.

Concrete

Tile power on the reinforced base, or an existing early, not desirable. Water does not seep into the ground, in the seams of the connection, the remaining moisture is crystallized in the winter, increasing in volume. This property educated Ice Destroy the created design, leading to deformation individual sections.

Laying tiles

Adhering to directions from ourselves, ensure the preservation of the chosen inclination level. The master moves along the surfaced surface without disturbing the integrity of the substrate. Stage in the following order:

  • Drawing in a circle from the center.
  • All others from the edge of the object located in the paving zone.
  • From the lowest point.

Leave a gap of 2-3 millimeters between the joints of the compound, fixing with wedges of plastic or wood, each next form. Technological process It provides for the deepening of the side planes by 50% of the material in the mass of the base from the sand or its mixture. Therefore, making the substrate, take into account the thickness of the paving slabs used for the flooring.

The level of control over the angle of inclination is constantly next to the worker. Stretched transverse rope, becomes a height benchmark. Having positive three rows, make control measurements. The convexities of the surface are adjusted by rubber inquiry or wooden bar. Sand or dry mixture is added under the sensory tile.

On the loose sidewalk moves carefully, until completely fixing the surface. Correct the protruding material, tapping from above or on the side.

Video recommendations for proper laying of paving slabs from specialists


Seaming seams compound

Complete with your own hands the work launched is easy. Using clean sand for the first layer, for the second filling of the openings, a dry mixture with cement in proportion 1: 1.

Having reinforced the composition of the brush into empty spaces, ensure the density of the tiles given by the technological conditions. Make sure the work performed is to help the visual assessment of the surface, after cleaning the residual residues.

Carefully cleaned surface from residues, it is irrigated with water. Moist, connecting with a mixture of sand and cement, spontaneously concrete seams. Do not completely frozen, the struts are removed. After some time, the surface of the track is repeatedly sprinkled with dry solution, evenly distributing on the remaining openings, belongs to the residues, and water with water without pressure, by spraying before forming on the surface of the puddle.

Contrary to popular belief, independent laying of paving slabs is a completely feasible task. This is one of the options for finding a plot in the country or next to country house, the execution of which is possible without assistance. In the article we will talk about the technology of laying paving slabs with their own hands, we will analyze the detailed step-by-step instructions, as well as show the schemes, photos and video materials.

It is necessary to carefully calculate the intended sizes of the site before starting work on its markup. The length and width of the pavement area is best made to multiple, based on the size of the prepared paving slabs, in order to avoid its cuts. Methods of laying paths from solid tiles are the most durable, so it is worth avoiding its cutting. After completing with the calculations, you need to measure the area for laying with the help of pegs and cord, stretched between them, as well as roulettes. Do not forget that you need to do a small groove for the curb around the perimeter.

After marking tracks, it is advisable to walk along the alleged route, because then it will be necessary to walk many times. If everything suits, then you can proceed to the next stage of work.

The first stage is the choice and preparation of the platform for paving slabs. Of course, you need to see if there are necessary tools. You will need:

  • pins or stakes (from metal or wood, not fundamentally);
  • rubber hammer;
  • construction level (for tile tilt);
  • hose with a divider or a large watering can (if there is no water supply);
  • broom;
  • rake;
  • smooth long object (channel, pipe or corner).

After making sure the availability of the necessary inventory, you can start work.

For high-quality work, you need to know how to properly lay paving slabs. The manual described below will help you cope with this task.

Plugs are placing the boundaries of the site where the laying is planned. If the fence is planned to paving borders, then a small supply should be left.

For a tile of 25 × 25 cm in size, it is logical to make the length and width of the area to multiple a quarter meters. If the tile is 30 × 30 cm, then multiple 30 simitiments, and so on. It will get rid of the need to cut the tile and make the design more durable.

Align the platform

In the process of laying the main task for high-quality coverage, the paving slabs will be a prepared level basis. It must be aligned throughout the area, so that later I did not have to redo anything.

From the selected area, it is necessary to cut the rod. This will ensure the removal of the root system, which will some extent prevents the germination of plants in the jacks of tiles. Such work is also useful in that the base is prepared for the subfolder, due to which the surface can be aligned. Now we achieve a smooth soil device on the site. We do it by cutting the hills and sludge the soil into lowlands and pits.

In the process of this stage, it is also necessary to take care of the availability of water drain, for which it is enough to make a small bias of the base. The formed surface is carefully processing rakes and tamper.

In the event that the soil is soft, it should be moistened and well tumped to prevent shrinkage.

Subsequent work on the preparation of the placed area

Having completed work with the relief, it is necessary to fall asleep 2 layers, the first of which consists of gravel, and the next from the sand.

If the coating is to serve for the parking lot on it, then the best way Sitting paving slabs on the base of concrete.

It is necessary to carefully catch each layer, the ideal size of which is between 3 to 5 cm. In some situations, geotextiles are placed between gravel and sand, which does not allow gravel with sand, but does not prevent the moisture outflow.

Cooking a layer of embossed

Here, the general case of laying tiles in the country can be divided into two options. The first is the laying of paving slabs on a concrete base, the second is the use of materials that allow laying without cement, for example, in the sand. The optimal height of the mound is about 7 cm. In the marking stakes, stretch the line or the rope along the selected level.

At the same stage, it will be necessary to determine the water flow line. Stagnant water is capable of blurring the base of the tile.

Install the border

Border set before faster. Prepare a small trench for installation of a curb and pour on the bottom of the sand layer at 5 cm. The trench depth is chosen with the calculation so that 60% of the height of the stone is under power.

The border must be installed in such a way as to withstand not only the steps of the child on it, but also to hit the car.

As already noted, to avoid trimming, paving slabs should be placed on accurate calculations, based on its size. If without trimming, it fails, use the "Bulgarian" with a cutting circle along concrete. And how does the paving slabs with cropped edges fit? As well as a solid tile, but in this case you should pay more attention to the drawing of the picture.

After determining the level of the base, we fall asleep the pad under the sidewalk of the sand, the rambling it. Then, according to the stretched levels, we spill the sand with robbles, configuring it to the condition of the smooth surface of the pipe (channel, corner). You must have a flat place. Now it must be moistened with water trickles (without pressure to avoid leaching).

Laying tiles

Making the laying of paving slabs on the sand, carefully press it to the base and, if necessary, cut the rubber hammer. Do not forget about the drawing that you post, as the pattern should go sequentially and in accordance with the planned scheme. When the tile is laid, it is desirable for an additional seal to pass the vibropilet. As a result, the surface will be absolutely smooth, each tile "will grow" with the base, and water will not accumulate on the surface.

To put the tile on bends and turns, it is necessary to increase the gap between it, and their maximum width should not exceed 0.8 cm. In general, a special tile with rounded edges is for sale (model "Classic"). Rectangular tile for this is better not to use.

It remains only to fall asleep the finished area of \u200b\u200bthe sand paving sand and lure a brush with a rigid pile. At this stage, the work in principle ends, and the new sidewalk can be used.

Fall asleep in the joints and on the surface of the sand should not contain organic materials and salts that are able to cause the appearance of hears.

In addition to the beautiful sidewalk, you can get excellent skills that can easily apply for the basis of your new business on laying paving slabs.

It is worth mentioning the minimum requirements for the main maintenance of new tracks. First of all, the paving slabs, like any other coating, requires systematic cleaning from dirt and dust. Given this fact, it is better to stop your choice on a dark tile that does not require careful cleaning. Tracks with patterns need to be installed regularly with a brush and detergent.

Special attention should be paid to the purity of the tracks in the winter season. It is strictly forbidden to use metal and sharp items in the process of care for paving tiles, for example, pricking ice, etc.

In no case cannot be sprinkled with sidewalks with salt, since it is a conclusion not only ice, but with it and the upper cement layer of tiles.

If you decide to take advantage of a special tool, it is better to check it on an imperceptible piece of tiles, as many chemicals that are able to spoil the appearance of the track. Cover the paving slabs with paints or varnish undesirable to avoid the loss of the initial external view and aesthetic appearance, the more they can easily spoil the coating. We sincerely hope that our article will help you in work.

    If the option of self-laying of paving slabs does not suit you, then it is worth a responsible to approach the choice of the company!

    Schemes

    And now you can get acquainted with the laying schemes of paving slabs: