The estimate for the renovation of the building is a sample. An example of an estimate for the repair of a room, important points in drawing up
Sample ready estimate for repair and Finishing work in an apartment with a total area of 64 m2 a new building at the address: residential complex "microdistrict Finsky-Potapovo 3A".
Estimate number 4 for the implementation of repair and finishing work
Estimate for the purchase of rough materials
№ | Name of works | Unit rev. | Qty |
Pricing in rubles |
The cost in rubles |
Dismantling work | |||||
1 | Ceiling joints (rustic) | r.m | 8 | 150 | 1200 |
2 | Dismantling of sockets, switches, lamps | PC. | 12 | 75 | 900 |
3 | Dismantling the complete electrical panel | PC. | 1 | 650 | 650 |
Total: | 2 750 | ||||
Construction works | |||||
1 | Laying of partitions made of tongue-and-groove blocks or foam concrete up to 100 mm thick | sq.m | 5,8 | 420 | 2436 |
2 | Metal jumper device | r.m | 2 | 280 | 560 |
3 | Bath screen device from blocks | PC. | 1 | 1100 | 1100 |
4 | Steam insulation device ("penofol", "penoplex") balcony - floor, ceiling, walls | sq.m | 27 | 360 | 9720 |
5 | The device of coating thermal insulation "Akterm" | sq.m | 0 | 180 | 0 |
6 | Waterproofing joints adjacent to the street | sq.m | 6 | 185 | 1110 |
Total: | 14 926 | ||||
Painting and plastering works | |||||
1 | Plastering of walls (along beacons) up to 20 mm | sq.m | 25 | 385 | 9625 |
2 | Alignment of walls (as a rule) up to 10 mm - rooms, kitchen, corridor, pantry | sq.m | 154,5 | 200 | 30900 |
3 | Alignment of ceilings (as a rule) up to 10 mm kitchen, corridor, pantry, balcony | sq.m | 28 | 250 | 7000 |
4 | Sealing of ceiling joints (rustic) | r.m | 8 | 150 | 1200 |
5 | Surface priming (2 layers) ceiling, walls | sq.m | 0 | 60 | 0 |
6 | Surface finishing - ceiling, walls | sq.m | 0 | 45 | 0 |
7 | Putty ceilings for painting (complex of works) kitchen, corridor, pantry, balcony | sq.m | 28 | 350 | 9800 |
8 | Painting ceilings with w / e paint in 2 times | sq.m | 28 | 180 | 5040 |
9 | Putty of walls for painting (complex of works) | sq.m | 154,5 | 280 | 44805 |
10 | Painting walls with w / e paint for 2 times | sq.m | 154,5 | 140 | 21630 |
11 | Plastering window slopes up to 300 mm | r.m | 15 | 260 | 3900 |
12 | Filling of slopes for painting (complex of works) | r.m | 15 | 280 | 4200 |
13 | Coloring of slopes with w / e paint in 2 times | r.m | 15 | 180 | 2700 |
14 | Installation of arched painting corners with sealing of seams and joints | r.m | 22 | 65 | 1430 |
15 | Painting of pipes with a diameter of up to 50 mm | r.m | 26 | 120 | 3120 |
Total: | 145 350 | ||||
Joinery and carpentry works | |||||
1 | Installing the door block (ready-made kit) | PC. | 5 | 3000 | 15000 |
2 | Installation of slatted ceilings (up to 10 sq.m.) | sq.m | 4,4 | 880 | 3872 |
3 | Installation plastic window sills up to 300 mm | r.m | 4,5 | 750 | 3375 |
Total: | 22 247 | ||||
Tiling works | |||||
1 | Wall cladding with tiles (size 250-250 mm) bath, toilet | sq.m | 25 | 850 | 21250 |
2 | Installation of the hatch | PC. | 1 | 418 | 418 |
3 | Tile hatch device (with installation of the mechanism) | PC | 1 | 1100 | 1100 |
4 | Laying tiles on the floor (size 300-300 mm) bath, toilet, balcony | sq.m | 10 | 700 | 7000 |
5 | Drilling holes in tiles | PC. | 12 | 160 | 1920 |
6 | Grouting ceramic tiles(monocolor) | sq.m | 35 | 100 | 3500 |
7 | Tile door sill lining | r.m | 1 | 1000 | 1000 |
Total: | 36 188 | ||||
Floor arrangement | |||||
1 | Waterproofing floors in bathrooms | sq.m | 4,4 | 185 | 814 |
2 | Leveling screed device up to 3 mm | sq.m | 54,4 | 150 | 8160 |
3 | Laying laminate (with backing) | sq.m | 54,4 | 280 | 15232 |
4 | Installing the nut | r.m | 3 | 150 | 450 |
5 | Installation of skirting boards | r.m | 65 | 130 | 8450 |
Total: | 33 106 | ||||
Ventilation works | |||||
1 | Ventilation box insert | PC. | 1 | 319 | 319 |
2 | Installation of a ventilation duct (up to 2 m) | PC | 2 | 1650 | 3300 |
3 | Fan installation (with connection) | PC. | 2 | 308 | 616 |
Total: | 4 235 | ||||
Heating | |||||
1 | Alteration of the heating radiator inlet assembly | PC. | 3 | 4500 | 13500 |
2 | Heating radiator installation | PC. | 3 | 1500 | 4500 |
3 | Removal / installation of a radiator for finishing work (without dismantling the bracket to a ready-made place) | PC. | 3 | 500 | 1500 |
Total: | 19 500 | ||||
Plumbing work | |||||
1 | Temporary water supply device | set | 1 | 1650 | 1650 |
2 | Plumbing device | r.m | 6 | 600 | 3600 |
3 | Plumbing fixing | r.m | 6 | 120 | 720 |
4 | Installing the filter fine cleaning with pressure regulator | PC. | 2 | 1400 | 2800 |
5 | Collector installation (complex of works) | PC. | 2 | 2000 | 4000 |
6 | Laying of pipes HGV (m / layer, p / propylene, p / ethylene) | r.m | 26 | 270 | 7020 |
7 | Gasket sewer pipes(PVC) | r.m | 5 | 330 | 1650 |
8 | Thermal insulation of pipes | r.m | 26 | 50 | 1300 |
9 | Installation storage water heater(boiler) | PC. | 1 | 3300 | 3300 |
10 | Installation of a toilet bowl "Compact" | PC. | 1 | 2805 | 2805 |
11 | Installation of "moidodyr" | PC. | 1 | 3000 | 3000 |
12 | Mixer installation | PC. | 1 | 850 | 850 |
13 | Installing a hygienic shower | PC. | 1 | 850 | 850 |
14 | Installing a heated towel rail | PC. | 1 | 3300 | 3300 |
15 | Bath installation | PC. | 1 | 3700 | 3700 |
16 | Installing the bath mixer on a rod | PC. | 1 | 1250 | 1250 |
Total: | 41 795 | ||||
Electric installation work | |||||
1 | Shtraba device up to 30x30 mm | r.m | 16 | 275 | 4400 |
2 | Sealing the shtrab | r.m | 16 | 35 | 560 |
3 | Cabling | r.m | 255 | 50 | 12750 |
4 | Installing the socket (with socket device) | PC. | 33 | 300 | 9900 |
5 | Installation of the electrical distribution board of the consignment note | PC. | 2 | 650 | 1300 |
6 | Installation of automatic protection devices, diff.automatic devices, RCDs | PC. | 12 | 250 | 3000 |
7 | Installation of a socket, switch | PC. | 30 | 130 | 3900 |
8 | Installation of TV, Telephone, Internet sockets | PC. | 3 | 180 | 540 |
9 | Installation of TV, Telephone, Internet splitter | PC. | 1 | 280 | 280 |
10 | Installation of a built-in (spot) lamp | PC. | 6 | 200 | 1200 |
11 | Electric underfloor heating installation | sq.m | 2 | 750 | 1500 |
12 | Installation of underfloor heating relay | PC. | 1 | 350 | 350 |
13 | Marking of electrical installation sites (without project) | PC. | 33 | 35 | 1155 |
Total: | 40 835 | ||||
Total for work: | 360 932 | ||||
Total according to estimate No. 4: | 360 932 |
Flow table No. 1 rough material.
Table No. 1 on the consumption of construction and finishing rough material in an apartment with a total area of 64 m2, a new building at the address: residential complex "microdistrict Finsky-Potapovo 3A".
Examples of samples of a table of accounting for the consumption of rough material
№ |
Name material |
pcs / m2 bags |
the cost |
general the cost |
1 | "Rodband" mixture with a layer thickness of no more than 2 cm | 87 | 370 | 32190 |
2 | Sand concrete M300 with a screed layer thickness of no more than 5 cm | 145 | 160 | 23200 |
3 | Plaster lighthouse 0.6 | 45 | 40 | 1800 |
4 | Plaster lighthouse 1.0 | 12 | 45 | 540 |
5 | Betokontakt "EURO" | 3 | 1350 | 4050 |
6 | Primer "Prospectors" | 5 | 450 | 2250 |
7 | Foam block No. 5 in pieces | 6 | 45 | 270 |
8 | Foam block No. 7 in pieces | 84 | 55 | 4620 |
9 | Waterproof plasterboard 12 | 2 | 370 | 740 |
10 | Plaster putty "Fugenfüler" | 1 | 750 | 750 |
11 | Mounting glue for Perlfix blocks | 3 | 320 | 960 |
12 | Tile adhesive "Flizen" | 6 | 350 | 2100 |
13 | Self-leveling floor "Prospectors" | 8 | 320 | 2560 |
14 | Putty "Vetonit" LR + | 9 | 750 | 6750 |
15 | Spider web "Oscar" 50m2 | 1 | 1150 | 1150 |
16 | Profile 27/28 "Knauf" | 6 | 100 | 600 |
17 | Profile 60/27 "Knauf" | 4 | 130 | 520 |
18 | Finishing putty "Pro Form" | 1 | 1350 | 1350 |
19 | Suspension "Knauf" | 40 | 20 | 800 |
20 | Film density -150 | 60 | 50 | 3000 |
21 | Beam 50/50 planed | 3 | 200 | 600 |
22 | Planed board 150/20 | 3 | 300 | 900 |
23 | Trash bags | 120 | 10 | 1200 |
24 | Oscar spider web glue | 1 | 1350 | 1350 |
25 | Waterproofing coating "Ceresit 65" | 6 | 750 | 4500 |
26 | Rule 2.5 | 1 | 500 | 500 |
27 | Rule 2.0 | 1 | 400 | 400 |
28 | Rule 1.5 | 1 | 300 | 300 |
29 | Dowel nail 60/40 | 2 | 250 | 500 |
30 | Facade mesh 160 density | 1 | 1250 | 1250 |
31 | Putty "Uniflot-Knauf" | 1 | 1100 | 1100 |
32 | 12 liter bucket | 2 | 120 | 240 |
33 | Bucket 20 liters | 2 | 180 | 360 |
34 | Basin 60 liters | 1 | 350 | 350 |
35 | Masking tape, paper | 5 | 70 | 350 |
36 | Packaging tape | 2 | 70 | 140 |
37 | Self-tapping screws 0.35 universal | 2 | 130 | 260 |
38 | Self-tapping screws 0.65 for wood | 1 | 130 | 130 |
39 | Self-tapping screws 0.75 for wood | 1 | 130 | 130 |
40 | Self-tapping screws 0.25 universal | 2 | 130 | 260 |
41 | Galvanized painting corner | 18 | 35 | 630 |
42 | Alabaster in bags | 1 | 280 | 280 |
43 | Silicone in a tube | 1 | 140 | 140 |
44 | Glue in a tube "FixAll" | 1 | 420 | 420 |
45 | Crosses 1.5 for tile joints | 4 | 100 | 400 |
46 | Tile Joint Wedges | 2 | 100 | 200 |
47 | Cable NUM 3 / 1.5 "Sevkabel" | 100 | 35 | 3500 |
48 | Cable NUM 3 / 2.5 "Sevkabel" | 150 | 47 | 7050 |
49 | Cable NUM 3/4 "Sevkabel" | 36 | 82 | 2952 |
50 | Cable NUM 3/6 "Sevkabel" | 5 | 95 | 475 |
51 | Corrugation 16 | 100 | 3 | 300 |
52 | Corrugation 20 | 200 | 4 | 800 |
53 | Internet cable "FTP" | 10 | 22 | 220 |
54 | TV cable "SAT 703" | 40 | 25 | 1000 |
55 | Telephone cable "KSPV" | 10 | 12 | 120 |
56 | Crab TV 1/3 | 1 | 250 | 250 |
57 | Insulating tape | 1 | 40 | 40 |
58 | Punched tape | 1 | 180 | 180 |
59 | Lamp 150v | 5 | 40 | 200 |
60 | Socket boxes for concrete | 50 | 10 | 500 |
61 | Automatic machine 10 amp. "ABB" | 2 | 150 | 300 |
62 | Automatic machine 16 amp. "ABB" | 3 | 150 | 450 |
63 | Automatic machine 25 amp. "ABB" | 5 | 150 | 750 |
64 | RCD "ABB" | 1 | 1250 | 1250 |
65 | DIF automatic machine 25 amp. | 1 | 1350 | 1350 |
66 | Rebar 12 | 3 | 220 | 660 |
67 | ||||
68 | Lifting material "in tons" | 8 | 1500 | 12000 |
69 | Delivery of materials "gazelle" | 4 | 1500 | 6000 |
70 | Total: | 147 787 |
1. General Provisions
1.1. This Policy regarding the processing of personal data (hereinafter referred to as the Policy) was developed in the requirements of Federal Law No. 152-FZ "On Personal Data" dated July 27, 2006, as well as other regulatory legal acts Russian Federation in the field of protection and processing of personal data and applies to all personal data that Stroy-Legko LLC (hereinafter referred to as the “Operator”) may receive from the subject of personal data intending to conclude a civil contract with the Operator, as well as from the subject of personal data that is with the Operator in a relationship governed by labor law.
1.2. The operator protects the processed personal data from unauthorized access and disclosure, misuse or loss in accordance with the requirements of the Federal Law of July 27, 2006 No. 152-FZ "On Personal Data".
1.3. The meaning of the terms and definitions used in this Policy, namely: "personal data", "processing of personal data", "automated processing of personal data", "dissemination of personal data", "provision of personal data", "blocking of personal data", " destruction of personal data "," personal data information system ", - corresponds to the terminology given in Article 3 of the Federal Law No. 152-FZ" On Personal Data "dated July 27, 2006.
The Internet is a set of interconnected international data transmission networks based on the use of a set of TCP / IP protocols and using a single address space.
Site - information (a system of web pages) posted on the information and telecommunications network Internet at certain network addresses (URL).
User - a user of the Internet, including the Site.
Operator - Limited Liability Company "STROY-LEGKO" (INN: 7708281231, legal address: Moscow, Talalikhina street, house 41, building 14), organizing the processing of personal data in the manner and on the conditions provided for in this Policy, including determining the purposes of processing personal data to be processed and actions (operations) performed with personal data.
2. Processing of personal data
2.1. Principles of processing personal data
2.1.1. The processing of personal data is limited to the achievement of specific, predetermined and legitimate purposes. Processing of personal data that is incompatible with the purposes of collecting personal data is not allowed.
2.1.2. It is not allowed to combine databases containing personal data, the processing of which is carried out for purposes incompatible with each other.
2.1.3. Only personal data that meet the purposes of their processing is subject to processing.
2.1.5. When processing personal data, the accuracy of personal data, their sufficiency, and, if necessary, relevance in relation to the purposes of processing personal data must be ensured. The operator must take the necessary measures or ensure that they are taken to remove or clarify incomplete or inaccurate data.
2.1.6. The storage of personal data should be carried out in a form that makes it possible to determine the subject of personal data, no longer than the purpose of processing personal data requires, unless the storage period for personal data is established by federal law or an agreement to which the subject of personal data is a party. The processed personal data are subject to destruction or depersonalization upon achievement of the processing goals or in case of loss of the need to achieve these goals, unless otherwise provided by federal law.
2.2. Personal data processing conditions
2.2.1. The processing of personal data must be carried out in compliance with the principles and rules provided for by this Policy, and is allowed in the following cases:
1) the processing of personal data is carried out with the consent of the subject of personal data to the processing of his personal data;
2) processing of personal data is necessary for the execution of an agreement to which the subject of personal data is a party, as well as for concluding an agreement on the initiative of the subject of personal data (including the User of the Site);
3) the processing of personal data is necessary to exercise the rights and legitimate interests of the operator or third parties, or to achieve socially significant goals, provided that this does not violate the rights and freedoms of the subject of personal data;
4) processing of personal data is carried out, access of an unlimited number of persons to which is provided by the subject of personal data or at his request (personal data made publicly available by the subject of personal data);
5) processing of personal data subject to publication or mandatory disclosure in accordance with federal law.
2.2.2. The operator has the right to entrust the processing of personal data to another person with the consent of the subject of personal data, on the basis of an agreement concluded with this person. The person who processes personal data on behalf of the operator is obliged to comply with the principles and rules for the processing of personal data provided for by this Federal Law. The person who processes personal data on behalf of the operator is not obliged to obtain the consent of the subject of personal data to process his personal data. In the event that the Operator entrusts the processing of personal data to another person, the Operator bears responsibility to the subject of personal data for the actions of this person. The person who processes personal data on behalf of the Operator is responsible to the Operator.
2.3. Receiving personal data. The procedure for processing personal data.
2.3.1. All personal data is received by the operator directly from the subject of personal data. In the case when personal data is provided on the Site, it is presumed that the subject of personal data is the Site User. If the personal data of the subject can only be obtained from a third party, then the subject must be notified of this or consent must be obtained from him.
2.3.2. The operator must inform the subject about the purposes, the alleged sources and methods of obtaining personal data, the nature of the personal data to be received, the list of actions with personal data, the period during which the consent to the processing of personal data is valid, and the procedure for its withdrawal.
2.3.3. Documents containing personal data are created by:
- copying the originals of documents of the subject of personal data;
- entering information into accounting forms;
- obtaining originals of the necessary documents;
- filling out special forms on the Site.
2.3.4. Purposes of processing personal data:
- labor relations between the subject of personal data and the Operator; - civil legal relationship between the subject of personal data and the Operator.
– individuals having an employment relationship with the Operator, planning to conclude an employment contract or terminating the employment contract with the operator;
- individuals who are in civil law relations with the Operator or who are planning to conclude a civil law contract.
2.3.6 The processing of personal data is carried out:
- using automation tools;
- without the use of automation tools.
2.4. Storage of personal data.
2.4.1. Personal data of subjects can be obtained, undergo further processing and transferred to storage both on paper and in electronic form.
2.4.2. Personal data recorded on paper are stored in lockable cabinets or in locked rooms with limited access rights.
2.4.3. The personal data of subjects processed using automation tools for different purposes are stored in different folders.
2.4.4. The storage of personal data in a form that makes it possible to determine the subject of personal data is carried out no longer than the purpose of their processing requires, and they are subject to destruction upon achievement of the processing goals or in case of loss of the need to achieve them.
2.5. Destruction of personal data
2.5.1. Destruction of documents (media) containing personal data is carried out by using a shredder (for paper media), or erasing or formatting the media (for electronic media).
2.5.2. The fact of destruction of personal data is documented by an act on the destruction of media.
2.6. Transfer of personal data
2.6.1. The operator transfers personal data to third parties only in the following cases:
- the subject has expressed his consent to such actions;
- the transfer is provided for by Russian or other applicable law within the framework of the procedure established by law.
2.6.2. The list of persons to whom personal data is transferred:
- State off-budget funds;
- tax authorities of the Russian Federation;
- banks for calculating wages (on the basis of an agreement);
- other third parties (on the basis of an agreement and subject to the consent of the personal data subject to the transfer of personal data);
- law enforcement agencies in cases established by law.
3. Protection of personal data
3.1. The operator has created a personal data protection system, consisting of legal, organizational and technical protection.
3.2. Legal protection is a set of legal, organizational, administrative and regulatory documents that ensure the creation, functioning and improvement of the personal data protection system.
3.3. Organizational protection includes the organization of the management structure of the personal data protection system, information protection when working with employees, partners and third parties.
3.4. The subsystem of technical protection includes a complex of technical, software, software and hardware that ensure the protection of personal data.
3.5. The main measures for the protection of personal data used by the Operator are:
3.5.1. Appointment of a person responsible for the processing of personal data, who organizes the processing of personal data, training and instruction, internal control over the observance of the institution and its employees with the requirements for the protection of personal data.
3.5.2. Identification of current threats to the security of personal data during their processing and development of measures and measures to protect personal data.
3.5.3. Establishing rules for accessing personal data, as well as ensuring registration and accounting of all actions performed with personal data.
3.5.4. Establishment of individual passwords for employees' access to the information system in accordance with their production responsibilities.
3.5.5. Application of the procedure for assessing the conformity of information protection means that have passed in the prescribed manner
3.5.6. Certified anti-virus software with regularly updated databases.
3.5.7. Compliance with the conditions ensuring the safety of personal data and excluding unauthorized access to them.
3.5.8. Taking measures to protect against unauthorized access to personal data.
3.5.9. Training of the Operator's employees who are directly involved in the processing of personal data, the provisions of the legislation of the Russian Federation on personal data, including the requirements for the protection of personal data, documents defining the Operator's policy regarding the processing of personal data, local acts on the processing of personal data.
3.5.10. Internal control and audit.
4. Basic rights of the subject of personal data and obligations of the Operator
4.1. Basic rights of the subject of personal data.
The personal data subject has the right to access his personal data and the following information:
- confirmation of the fact of processing of personal data by the Operator;
- legal grounds and purposes of personal data processing;
- the purposes and methods of processing personal data used by the Operator;
- the name and location of the Operator, information about persons (with the exception of the Operator's employees) who have access to personal data or to whom personal data may be disclosed on the basis of an agreement with the Operator or on the basis of federal law;
- terms of processing personal data, including the terms of their storage;
- the procedure for the exercise by the subject of personal data of the rights provided for by the current legislation;
- the name or surname, first name, patronymic and address of the person who processes personal data on behalf of the Operator, if the processing is entrusted or will be entrusted to such a person;
- contacting the Operator and sending him requests;
- appeal against the actions or inaction of the Operator.
4.2. Obligations of the Operator.
The operator is obliged:
- when collecting personal data, provide information on the processing of personal data;
- in cases where personal data was not received from the subject of personal data, notify the subject;
- in case of refusal to provide personal data, explain to the subject of personal data the consequences of such a refusal;
- publish this Policy on its information resources on the Internet on the Site, providing unlimited access to it for all users;
- take the necessary legal, organizational and technical measures or ensure their adoption to protect personal data from unauthorized or accidental access to them, destruction, alteration, blocking, copying, provision, dissemination of personal data, as well as from other illegal actions in relation to personal data;
- provide answers to inquiries and requests from subjects of personal data, their representatives and the authorized body for the protection of the rights of subjects of personal data.
If there is a need to repair an office space, then the question immediately arises of the compulsory preparation of an estimate for repairs. When contacting a construction company, it is better to first invite an estimator who will calculate everything. A correctly made estimate for the repair of an office space includes parameters such as an indication of the materials from which the room is built. This is due to the fact that the cost of renovation depends on the level of complexity, and work in an old building with brick walls more difficult than in a modern monolithic. The estimate also includes the names of the work that is planned to be carried out, the units of measurement for these types of work, the quantity, the cost per unit and the cost of a particular type of work. As a result, the total cost of the work. Moreover, each room is calculated separately. Some types of estimates include only the following parameters: materials, work, total (separately per square meter and total).
Ultimately, this document will allow the client to navigate the necessary costs, to think over the types of repairs that are needed in the first place. The quality and cost of the building materials themselves can be discussed with the contractors additionally. In addition, you can simply purchase the required amount of finishing materials yourself, and it is the responsibility of the company to include the purchase of only rough building materials yourself. construction works... You can order an estimate from a company specializing in the production of such documentation in order to control the contractor and not overpay.
It should be borne in mind that the cost of the work indicated in the estimate for the repair of office space may vary depending on the timing of the work, therefore, if you decide to sign the estimate presented by the company, you must indicate the time frame for the order.
If, before the start of the repair, it is not clear until the end of its volume or individual points, then when concluding the contract, an approximate (approximate) estimate for the repair of the office is signed. Individual paragraphs of such a document can be changed in accordance with changing circumstances.
If there is no time to compile the documentation ourselves, but the desire to plan in advance renovation work is available, the standard estimate can be downloaded. At the same time, it is possible to choose the option that corresponds to the planned repair.
Appendix No. _ to Construction Contract No. __ dated _____ 2018 | ||||||||
Estimates for repair work at the address: Moscow, | ||||||||
room | Name of work and materials | Unit Rate Number | unit of measurement | Completed works | ||||
estimated positions | number | price per unit of work / materials, rub. | cost of work, rub. | cost of materials, rub. | ||||
5,00 | ||||||||
1 | Civil works | |||||||
2 | 1 | Dismantling of wall frames made of MDF and gypsum board | sq.m. | 35,08 | 90,00 | 3 157,20 | ||
3 | 2 | Dismantling, fitting in place and installation of the door block together with the wooden frame while maintaining | PC. | 2,00 | 2 819,00 | 5 638,00 | ||
4 | 2 | Dismantling electrical outlets | PC. | 14,00 | 90,00 | 1 260,00 | ||
5 | 3 | Removing the carpet | 6,50 | sq.m. | 14,25 | 80,00 | 1 140,00 | |
6 | 4 | Removing backed laminate flooring | sq.m. | 18,50 | 90,00 | 1 665,00 | ||
7 | 5 | Removing wallpaper from the walls | sq.m. | 85,95 | 80,00 | 6 876,00 | ||
8 | 6 | Diagonal flooring of porcelain stoneware tiles | sq.m. | 32,75 | 780,00 | 25 545,00 | ||
9 | 6.1 | Ceramic granite tile Estima 400 mm. * 400 mm. | sq.m. | 40 | 725,00 | 29 000,00 | ||
10 | 6.2 | Tiled glue | kg. | 223 | 17,00 | 3 791,00 | ||
11 | 7 | Arrangement of strobes in the walls for laying electrical networks | r.m. | 8,00 | 320,00 | 2 560,00 | ||
12 | 8 | Arrangement of nests in walls and boxes for the installation of electrical boxes | PC. | 29,00 | 260,00 | 7 540,00 | ||
13 | 8.1 | Crown | PC. | 2,0 | 590,00 | 1 180,00 | ||
14 | 8 | Installation of sockets and switches | PC. | 29,00 | 280,00 | 8 120,00 | ||
15 | 8.1 | Insulating tape | PC. | 2,0 | 34,00 | 68,00 | ||
16 | 9 | Layered wall primer | sq.m. | 85,95 | 30,00 | 2 578,50 | ||
17 | 9.1 | Primer Prospectors universal | l. | 26,0 | 32,00 | 832,00 | ||
18 | 10 | Partial plastering of wall surfaces | sq.m. | 68,76 | 360,00 | 24 753,60 | ||
19 | 10.1 | Plaster plaster mix | 8,00 | kg. | 550 | 18,00 | 9 901,44 | |
20 | 10.2 | Lighthouse rail | PC. | 10,0 | 32,00 | 320,00 | ||
21 | 10 | Coarse putty on walls and window slopes | sq.m. | 85,95 | 240,00 | 20 628,00 | ||
22 | 10.1 | VETONIT LR + putty | kg. | 366 | 29,00 | 10 614,00 | ||
23 | 10.2 | sq.m. | 3,0 | 168,00 | 504,00 | |||
24 | 11 | Reinforcement of walls and window slopes with fiberglass | sq.m. | 85,95 | 220,00 | 18 909,00 | ||
25 | 11.1 | Fiberglass painting | sq.m. | 100,0 | 29,00 | 2 900,00 | ||
26 | 11.2 | Adhesive for fiberglass | kg. | 28 | 95,00 | 2 660,00 | ||
27 | 12 | Finishing filler of walls and window slopes | sq.m. | 85,95 | 160,00 | 13 752,00 | ||
28 | 12.1 | Putty Shitrok | kg. | 64 | 59,00 | 3 776,00 | ||
29 | 12.2 | Abrasive coated sandpaper | sq.m. | 2,0 | 168,00 | 336,00 | ||
30 | 13 | High quality water-based wall painting | sq.m. | 85,95 | 160,00 | 13 752,00 | ||
31 | 13.1 | W / e interior paint | l. | 33,6 | 237,00 | 7 963,20 | ||
32 | 13.2 | Masking tape | PC. | 7 | 48,00 | 336,00 | ||
33 | 14 | High quality water-based ceiling painting | sq.m. | 37,50 | 180,00 | 6 750,00 | ||
34 | 14.1 | W / e paint Euro 2 | l. | 15,0 | 180,00 | 2 700,00 | ||
35 | 15 | Cutting and installing porcelain stoneware skirting boards | r.m. | 43,00 | 380,00 | 16 340,00 | ||
36 | 15.1 | Porcelain stoneware | porcelain stoneware | sq.m. | 9 | 725,00 | 6 525,00 | |
37 | 15.2 | Tiled glue | kg. | 36,0 | 17,00 | 612,00 | ||
38 | 16 | Installation of radiator screens | PC. | 2,00 | 680,00 | 1 360,00 | ||
39 | 16.1 | Screen with fasteners | PC. | 2 | 1120,00 | 2 240,00 | ||
40 | 17 | Room cleaning | sq.m. | 37,50 | 45,00 | 1 687,50 | ||
41 | 18 | Taking out the trash | tn. | 1,20 | 1900,00 | 2 280,00 | ||
42 | 18.1 | Garbage bags | PC. | 36,00 | 6,00 | 216,00 | ||
43 | 18.2 | Masking tape | PC. | 8 | 48,00 | 384,00 | ||
44 | 18.3 | PVC film | sq.m. | 40 | 19,00 | 760,00 | ||
45 | 18.4 | Container rental | PC. | 1 | 3990,00 | 3 990,00 | ||
46 | Total work | 186291,80 | ||||||
47 | Total materials | 91608,64 | ||||||
48 | Total direct costs | 277 900,44 | ||||||
49 | Total work with overhead costs (to salary) 17% | 217 961,41 | ||||||
50 | Total work with planned savings (to HP) 8% | 235 398,32 | ||||||
51 | Total work in the existing building and outside working hours (to MON) 20% | 282 477,98 | ||||||
52 | Total work and materials | 374 086,62 | ||||||
53 | Total according to the estimate with transport and procurement costs 6% | 396 531,82 | ||||||
55 | VAT 18% | 71 375,73 | ||||||
55 | In total, according to the estimate, including VAT in rubles. | 467 907,55 |
The estimate is one of the most important documents from which the repair, construction or reconstruction of any object begins. Drawing up an estimate for the renovation of an apartment is a mandatory procedure that is primarily necessary for the Customer. This basic document should be prepared as an annex to the contract.
ORDER APARTMENT REPAIR
The calculation of the estimate for the renovation of apartments is carried out by a specialist - estimator. To begin with, our specialist leaves for the place of repair, inspects the premises, makes measurements of the premises, gets acquainted with the condition of floors, ceilings, walls, windows and doors, learns the individual wishes of the Customer and receives a technical assignment.
Based on all the information received and the measurements of the premises, project documentation, an estimate is made for overhaul apartments. You can do without an estimate, perhaps only if you are carrying out a small redecorating or partial renovation of the interior. But all the same, an estimate is always needed, a description of the types of work tied to the estimate gives undoubtedly a number of advantages when working at a construction site during repairs. Thanks to the compiled preliminary estimate, the customer receives detailed information about the list of types of work and materials required for the repair, and also sees an accurate calculation of the cost of these finishing works and materials.
A typical commercial estimate does not look like an Excel spreadsheet, which must indicate the types of work, units of measure and cost. Our company uses the services of experienced estimators, we also constantly monitor prices for building materials, which allows us to significantly save money.
You, as a customer, have the ability to control the progress of work and cost items. When choosing a contractor for work, it is the analysis of the estimate that gives a complete picture of the cost of the work, and allows you to assess the professionalism of the contractor.
We can immediately tell you that the prices for complex repairs are much lower than for certain types works. Each order is individual! The cost of services depends on the types of work and their volume. Moreover, the larger the volume, the lower the price for repair and finishing work.
Sample estimate for finishing work
No. / pos |
Name of works |
unit. |
number |
Price, rub |
Amount, rub |
Dismantling work, garbage removal |
|||||
Cleaning |
|||||
Cleaning walls to concrete (from wallpaper, putty) |
|||||
Cleaning the ceiling to concrete (w / o paint, putty |
|||||
Cleaning floor to concrete (from old coating) |
|||||
Other dismantling |
|||||
Dismantling the skirting board |
|||||
Taking out the trash |
|||||
Removal of construction waste |
|||||
Electrical work |
|||||
Electrical, telephone and television wiring in walls and ceilings |
|||||
Installation of sockets, switches, spotlights, automata |
|||||
Plastering walls and leveling the floor (screed) |
|||||
Priming on concrete walls and ceilings |
|||||
Leveling ceilings (improved plaster) |
|||||
Wall leveling (improved plaster) |
|||||
Painting works |
|||||
Wall putty |
|||||
Ceiling filler |
|||||
Pasting walls vinyl wallpaper |
|||||
Painting ceilings water-based paint in 3 layers |
|||||
Cleaning and painting of pipes with heat-resistant paint |
|||||
Carpentry |
|||||
Ceiling cornice laying, filling and painting (foam or polyurethane, width up to 3 cm) |
|||||
Tiling works |
|||||
Laying ceramic tiles on the floor |
|||||
Cleaning |
|||||
Multiple cleaning during the repair and after the completion of the repair |
|||||
Total for finishing works: |
|||||
CUSTOMER |
CONTRACTOR |
||||
__________ |
__________ |
Sample estimate for rough material
No. / pos |
Name |
unit. |
Estimated price, rub |
Estimated amount, rub |
|
Basic estimate materials |
|||||
Plaster mix "Rotband" |
|||||
Mix Betonokontakt, 5kg |
|||||
Insulating tape |
|||||
Mounting boxes |
|||||
Junction boxes |
|||||
Alabaster G-5 ( gray) by 20kg |
|||||
Copper wire in double insulation PUNP 3x1.5 |
|||||
Copper wire in double insulation PUNP 3x2.5 |
|||||
Putty "Vitonit-LR" (Fin.) |
|||||
SHEETROCK ready putty 5.6kg (3.5l) ready putty |
bucket 3,5l |
||||
Deep penetration primer, 10l canister |
|||||
Water-based paint on latex basis Finkolor Euro-7, white matte 9l |
|||||
Tile adhesive Fliesen KNAUF, 25kg |
|||||
Polyethylene roll 3 m wide |
|||||
Dowels, screws, screws, nails, bolts and other fasteners |
|||||
Consumables and auxiliary materials, one-time tool |
|||||
Total for building and finishing materials |
|||||
Transportation costs, handling, overheads, contingencies, tool depreciation, budgeting, etc. from the cost of materials |
|||||
Total transportation and other expenses |
|||||
Dismantling, construction and finishing works, garbage removal |
|||||
|
TOTAL at estimated costs |
|
|
|
59749 |
CUSTOMER |
CONTRACTOR |
||||
__________ |
__________ |
For a rough estimate of the cost of renovating premises, use our online calculator. On our online repair cost calculator, you can calculate the approximate cost of repair work with rough materials. You just need to choose the type of repair (cosmetic repairs, major repairs, renovation), select the name of the room in which you are going to make repairs, then enter the area of the room in square meters by gender, and the rest Online calculator he will calculate everything himself and give it in the graph Total the approximate estimated cost of your renovation of premises.
Room renovation cost calculator - online
If you do not want to manually calculate the floor area or if you did not understand something when describing the calculations, then you can use with our calculator and calculate floor or ceiling area automatically.
For the calculation you need measure in meters length, width of the room and enter the data in order by filling out the form and you will automatically receive a calculation floor or ceiling area in square meters.
Calculator for calculating floor area, ceiling
H We will not load you with boring mathematical calculations. You just need to measure the main parameters, and the wallpaper calculator itself will approximately calculate the required amount of wallpaper for your room. Those who want more accurate calculations and measurements can read the article above. How to calculate how many wallpaper you need.